MopPact

Free tools · Worksheet

Roof measurement worksheet

Print it, climb with it, and come down with every number the estimate, the order, and the claim will ask for. One section per slope.

Job

Slope 1 — copy this block per slope

Notes: penetrations, flashing condition, problem areas.

Slope 2 — copy this block per slope

Notes: penetrations, flashing condition, problem areas.

Totals & takeoff

Waste guide, as a starting point: simple gable roofs waste the least, cut-up hip roofs the most. Most estimators land between roughly 10% on a simple roof and 15–20% on a complex one — your call, based on the roof in front of you, not a rule.

Slope factors (plan area → roof area)

3/12× 1.031

4/12× 1.054

5/12× 1.083

6/12× 1.118

7/12× 1.158

8/12× 1.202

9/12× 1.250

10/12× 1.302

12/12× 1.414

Any pitch → calculator

Method first: measurement methods compared · measurements & takeoff in CleanPact

Worksheets end up in a drawer. Jobs shouldn’t.

Record the measurement on the job in CleanPact and the takeoff, estimate, and order all start from the same numbers.